04/12/2009 | | Beginning of the System Technical Qualification Review |
19/11/2009 | | Delivery by Thales Alenia Space of the instrument Flight Model 2 to Astrium |
12/11/2009 | | Delivery by Astrium of the Satellite Flight Model 1 to CNES |
September 2009 | | Rendez-vous between the satellite, the controle center (SDGC) and the mission centres for the complete system tests |
February to end of July 2009 | | The satellite Flight Model 1 successfully passed the environment tests at Intespace: thermal, mechanical, solar generators deploiment and electro-magnetic tests. |
January 2009 | | Rendez-vous between the satellite, the controle center (SDGC) and the mission centres for the complete system tests |
End of July 2008 to mid-November 2009 | | Satellite Assembly Integration and Tests (AIT) |
1st half of 2008 | | Instrument Assembly Integration and Tests (AIT) |
November 2007 | | First programming test of the satellite Flight Model 1. The programming message, generated with the first version newly commissionned of the Programming Chain, was executed on the Satellite Flight Model 1 (in integration at Astrium in Toulouse) and enabled to acquire about 250 images. These images, downloaded using on board equipments representative of the Pleiades X-band station, are being processed on the Imaging Chain, itself newly delivered to CNES.
The success of this test is very promissing and demonstrates a maturity level reassuring while the system tests have not begun yet, over two years before the launch, now schedulled for the beginning of 2010. |
July 2007 | | End of first bus integration. |
June 2007 | | Satellite Critical Design Review. |
October 2006 | | Instrument Critical Design Review. |
June 2006 | | System Interface Review. |
February 2006 | | Multispectral filters flight model delivery. |
February 2006 | | Call for Tender for Users Centers Integration |
December 2005 | | Programming chain: the Software Specification Review was successful. The authorisation to begin the preliminary design phase was given. |
December 2005 | | Command Control chain: the Software Specification Review was successful. The authorisation to begin the preliminary design phase was given. |
December 2005 | | The compatibility tests between image telemetry reception stations and the on board telemetry equipment were successful. |
November 2005 | | Users Centers Integration: The Preliminary Design Review took place. The preparation phase for the corresponding call for tender begins. |
October 2005 | | Image chain: the Software Specification Review was successful. The authorisation to begin the preliminary design phase was given. |
October 2005 | | Call for Tender for BPD/GIDE |
October 2005 | | Multispectral detectors flight model delivery |
June 2005 | | Attribution of the encrypting server for the TC link and the decipherer for the instrument TM contract to Thales-Com. |
June 2005 | | Attribution of the Ground Segment parts supplying contracts:
Programming chain: attributed to CAP Gemini - CSSI industrial consortium
Image chain: attributed to Thales-IS
Image receiving station: attributed to IN-SNEC
Command-Control Center: attributed to CSSI
|
April 2005 | | Signature of the Agreement with Spain (Instituto Nacional de Tecnica Aerospacial). |
March 2005 | | Signature of the Agreement with Sweden (Swedish Natioanl Space Board). |
December 2004 | | Attribution of the launch contract to Arianespace, for a launch by a Soyouz rocket from Kourou. |
September 2004 | | Ratification of the Turin agreement, signed in September 2001 |
March 2004 | | PLEIADES cooperation agreement signature with Sweden |
December 2003 | | ORFEO System Definition Review |
October 2003 | | Satellites supplying contract signature with Astrium |
22-23/05/2003 | | "Very High Spatial Resolution Workshop at CNES |
1-2/04/2003 | | ORFEO users' seminar |
February 2003 | | Pleiades-HR Instrument Preliminary Definition Review |
December 2002 | | Pleaides-HR System Design Review |
28-29/05/2002 | | Pleaides internal seminar |
April 2002 | | Pleaides-HR Satellite Preliminary Definition Review |
March 2002 | | ORFEO Intermediate System Definition Review |
22/06/2001 | | Signature of a memorandum of agreement between CNES and ASI.
At the last Paris Air Show (June 2001), a memorandum of agreement was signed between the Centre National d'Etudes Spatiales (French space agency) and the Agenzia Spaziale Italiana (Italian space agency) for the definition phase of a Dual System with an Earth observation capability using optical satellites, radar satellites and an associated ground segment.
The Dual System to be developed is composed of the following elements:
An optical component composed of 2 satellites and the corresponding ground functions, developed under french control,
A radar component composed of 4 satellites and the corresponding ground functions, developed under italian control,
A user ground segment developed jointly by France and Italy
|
29/01/2001 | | Signature in Turin of a governmental agreement between France and Italy for cooperation in the field of Earth Observation. |
10/05/2000 | | Pleaides workshop "Conceivable Systems for Pleaides" |
08/03/2000 | | "Pleaides Requirements" users' workshop |