| |
 PLEIADES
|
 |
Click here to increase or decrease font size: A A A A
|
|
|
The project main steps
|
| Pleiades: a multi-missions concept and a partnership program.
|
| |
|
The decision about the setting up of the Pleiades program is the result of an in-depth study about the user needs evolution. A cooperation program was initiated between France and Italy, taking advantage of all the CNES Earth observation skills, to develop ORFEO, a dual Earth observation system with metric resolution, in which Pleiades (France) is the optic component and Cosmo-Skymed (Italy) is the radar component.
This component is made of two "small satellites" (mass of one ton) offering a spatial resolution at nadir of 0.7 m and a field of view of 20 km. Their great agility enables a daily access all over the world, which is a critical need for defence and civil security applications, and a coverage capacity necessary for the cartography kind of applications at scales better than those accessible to SPOT family satellites. Moreover, PLEIADES have stereoscopic acquisition capacity to meet the fine cartography needs, notably in urban regions, and to bring complete information given by aerial photography.
With respect to the constraints of the franco-italian agreement, cooperations have been set up for the PLEIADES optical component with Sweden, Belgium, Spain and Austria.
|

Latest update 14/12/2009
Before reproducing any content of this web site, please consult the Rights
|
|
|
|
|
 |
 |
December 4, 2009 Beginning of the System Technical Qualification Review |
|
 |
 |
November 19, 2009 Delivery by Thales Alenia Space of the instrument Flight Model 2 to Astrium |
|
 |
 |
November 12, 2009 Delivery by Astrium of the Satellite Flight Model 1 to CNES |
|
 |
 |
September 2009 Rendez-vous between the satellite, the controle center (SDGC) and the mission centres for the complete system tests |
|
 |
 |
February to end of July 2009 Satellite Flight Model 1 environment tests at Intespace |
|
 |
 |
January 2009 Rendez-vous between the satellite, the controle center (SDGC) and the mission centres for the complete system tests |
|
 |
|